CASE STUDY: Thundridge Bore Hole PS

Technical competence, Innovation and Value for money

JB Fabrication were awarded this contract as we have carried out many installations for the QS on other sites whilst he was working on the DCWW framework for one of the partners.

After a site survey to ensure the drawings tender drawings were accurate it was found that there were considerable discrepancies’ that affected the installation process, working closely with the client we overcame these challenges and agreed an alternative design for the pipework layout.

The installations were carried out during pre-arranged shutdowns, enabling the client to maintain the supply. All the work was completed on time as per programme.

The pumps were commissioned and back in service prior to the next arranged shutdown allowing for a run into service period.

The pipework was all manufactured to the highest standards by our coded welders and coated to DWI approved Resicoat R4.

We pride ourselves as being one of the foremost manufacturers within North Wales, always striving to exceed our clients expectation of quality and Health & Safety. With our engineers being at the sharp end of our industry we train them to the highest standards, always looking to involve them with H&S initiatives.

As a responsible employer we have committed to training our engineers to enable them to provide our customers with the best possible service with the skills to back up their enthusiasm and drive.