CASE STUDY: Dolbenmaen WTW

Technical competence, Innovation and Value for money

Our expertise in manufacturing and installation meant that we were able to bring a wealth of experience and knowledge into this project from the outset.

Due to delays on site arising from inclement weather conditions, we are able to manufacture and pre-assemble the DAF access steelwork and flooring within our comprehensive workshops, deliver them to site and install within a much shorter timescale, thus pulling back the site time lost and maintaining our program delivery deadlines.

We have also been awarded the 4 no. structural buildings for this project (DAF Building, RGF Building, Chlorine Storage Building & the Network Pumping Station) which, when combined with the mechanical contract award reduces the interfaces between different companies and allows us to co-ordinate the work in a more project friendly manner whilst still maintaining the highest of standards in health & safety.

We at JB Fabrication have always been focussed on the innovative ways to enhance our service to the client, several years ago we invested in TEKLA 3D design software for all our building and steelwork structure design, after careful consideration and consultation we have introduced SOLIDWORKS 3D design software for our pipework and mechanical installation projects, thus giving us a truly 3D design solution.

This investment has already paid dividends, not only with the enhanced visual aspects of the drawings but the clash avoidance traditionally only found out about on site.